During the July 21, 2014, shutdown, SkyTrain control had no idea the trains were still running fine while the power was down at control. They “assumed that the SkyTrain system had stopped functioning.”
During the July 21, 2014, shutdown, SkyTrain control had no idea the trains were still running fine while the power was down at control. They “assumed that the SkyTrain system had stopped functioning.”